Recent Posts
Categories
Archives

October 5th 2017

Today is a bit of a special day for us as it marks ten years since we got the keys to our first boat, Phoenix III. It is also five months to the day since I retired on May 5th.

A couple of lazy days were spent at Market Bosworth, we only managed one walk up to town but we did manage to catch up with Chris Hubbard, the manager at Bosworth marina. On Wednesday we decided to move on a bit further, this time getting as far as Shackerstone, where we tied on the deserted visitor moorings.

Shackerstone mooring

Caxton through the trees.

Following the usual pattern, we showered and had lunch before venturing out to the preserved station, home of the Battlefield line heritage railway.

Shackerstone Station

Wednesday’s services carried out by the railcar on the right.

Tea for two.

Memorabilia all around.

Victorian Tearoom

There is a Victorian tea room on the platform so of course we had to pop in and have a cuppa before we returned to the boat and battened down the hatches, ready for the forecast wind and rain to arrive. The rain arrived at around seven o’clock and the wind speed built up steadily after that. By the time we were ready for bed, the noise of the wind blowing through the surrounding trees was terrific, so much so that Sue was unable to get to sleep until after two (I was out like a light within ten minutes though!).

There were more high winds forecast for Thursday but when I went outside just after eight o’clock to check that everything was intact and where it should be, it didn’t seem too bad at all. Just over an hour later, we set off again and made the trip along the last part of the Ashby canal to Snarestone. It was a quiet journey and we met only two boats travelling in the opposite direction along the way. The phantom leaf ball intervened a few times in some of the wooded areas around Gopsall but it didn’t hold us up at all. Snarestone tunnel seems quite tame after Blisworth and Braunston, despite the fact that it has a bend in it and a low roof caused by mining subsidence.

On reaching the end, we again found the visitor moorings deserted so we headed for the service block at the end and did the necessary. By now the wind was really picking up again but for once it was a good thing because after reversing from the services, I brought Caxton to a halt and just let the wind blow the bow into the winding hole. Having let the wind do most of the work, it was simple enough to complete the manoeuvre and tie up at the bridge end of the moorings.

After lunch, Sue walked back to the canal shop and paid for membership of the Ashby Canal Association. We’ll go and inspect the restoration development on Friday when the strong north westerly wind has dropped.